About the SMS 2A project
MossIA is designing and constructing the railway between Sandbukta and Såstad known as the SMS 2A project.
The main features include two tunnels consisting of the 2,3 km Moss tunnel in the north and the 2,1 km Carlberg tunnel in the south and a new train station with an 800m long platform in sentrum.
With an expected completion date in 2026, the project will increase the frequency of departing trains between Moss and Oslo from two to four trains within an hour. Together with the Follobanen project, travel time will be reduced from approximately 55 minutes to 30 minutes.